Issue_766-enhance_power_management (#778)
* First implem + tests (not finished) * With tests of calculate_shedding ok * Commit for rebase * All tests ok for central_feature_power_manager * All tests not ok * All tests ok * integrattion tests - Do startup works * enhance the overpowering algo if current_power > max_power * Change shedding calculation delay to 20 sec (vs 60 sec) * Integration tests ok * Fix overpowering is set even if other heater have on_percent = 0 * Fix too much shedding in over_climate * Add logs * Add temporal filter for calculate_shedding Add restore overpowering state at startup * Fix restore overpowering_state * Removes poweer_entity_id from vtherm non central config * Release * Add Sonoff TRVZB in creation.md * Add comment on Sonoff TRVZB Closing degree --------- Co-authored-by: Jean-Marc Collin <jean-marc.collin-extern@renault.com>
This commit is contained in:
@@ -38,6 +38,8 @@ The opening rate calculation algorithm is based on the _TPI_ algorithm described
|
||||
|
||||
If a valve closure rate entity is configured, it will be set to 100 minus the opening rate to force the valve into a particular state.
|
||||
|
||||
Note: for Sonoff TRVZB you should not configure the "closing degree" parameter. This leads to a bug in the TRV and the `hvac_action` is no more working.
|
||||
|
||||
### Other self-regulation
|
||||
|
||||
In the second case, Versatile Thermostat calculates an offset based on the following information:
|
||||
|
||||
Reference in New Issue
Block a user